摘要
电力工业所面临的是日益加大的峰谷电差,因此就必须加大占全国火电机组装机容量1/3的国产300 M W 机组的调峰任务。外高桥电厂300 M W 机组,在通过168 h 试运行后即参与120 M W的调峰,为国内同类机组提供了良好的经验。
One of problems China's power industry facing now is ever increasing peak valley load difference.Hence the peaking duty of indigenous 300 MW generating units sharing 1/3 of national total thermal installed capacity must be increased.The 300 MW generating units of Shanghai Waigaoqiao Power Plant participated in cyclic operation of 120 MW immediately after passing 168 h of trial operation,providing good experience for the same kind units at home.
出处
《中国电力》
CSCD
北大核心
1999年第9期24-26,共3页
Electric Power
关键词
火力发电机组
调峰
可靠性
经济性
thermal power plant peak load regulating operation reliability economics