摘要
对迁钢2 650 m3全干法除尘高炉降料面操作实践进行了总结.风量、打水量的精确控制使炉顶煤气满足了干法除尘工艺要求,并最终通过准确把握停气、出渣铁时机等关键环节达到了安全、快速、高效地将料面降至风口带以下的目的.
The operating practice of the charge drooping line of 2650m3 blast furnace with dry dedusting system(DDS) in Shougang Qian'an Iron and Steel Co. , Ltd. is summarized. By precisely controlling the blast air flux and spaying water volume, the system worked well as anticipated. And the charge dropping line could be lowered to below the tuyere hole safely, quickly and effectively by further precisely controlling the times for air cutting-off and slag-tapping.
出处
《南方金属》
CAS
2011年第3期38-40,共3页
Southern Metals
关键词
高炉
干法除尘
降料面
blast furnace
dry dedusting system (DDS)
stock dropping line