摘要
分析了“九五”计划前3年铁路建设目标及完成情况,论述了“九五”后2年需完成的建设规模和投资体制改革任务。
The railway construction targets and their fulfillment for the first three years of the 'Ninth Five-year Plan' period are analyzed and the construction scope and the tasks of investment system reform required to be achieved within the last two years of the period are elaborated.
出处
《中国铁路》
1999年第9期18-20,共3页
China Railway
关键词
铁路建设
投资
体制改革
railway construction investment, 'Ninth Five- year Plan', analyses, prospects