分析了500kV 变电所两类安装位置的CVT不拆线预试,探讨了不拆线对线路侧CVT测试的影响。
This paper presents the analysis result on the method for two different fixing types of CVT with line in 500kV substation, and pays a especial attention to the influence on test result that are made on the CVT with line.