摘要 200 M W 机组高压厂用电自动切换存在的问题较多,导致厂用电事故扩大。传统的 B Z T 多不能适应大容量机组厂用电切换。从对发电设备安全、可靠、稳定运行的观点出发,分析了高压厂用电自动切换采用传统的 B Z T 所存在的问题,提出了相应的解决方法,并加以探讨。 There are problems in automatic power changeover of HV station service that extends the power incident.The traditional BSZ device is not suited for changing over the station service in large capacity power station.From the point of view of soft,reliable and stable operation,the problems are analyzed and the suggested solutions are proposed.
作者 谢平国
出处 《电力自动化设备》 EI CSCD 1999年第5期23-26,共4页 Electric Power Automation Equipment
关键词 高压厂用电 BZT装置 快速切换 发电设备 HV station service BZT device fast changeover
  • 相关文献

参考文献3

二级参考文献7

  • 1[1]Ravi S Sandhu, et al. Role-Based Access Control Models[J].Computer IEEE, 1996,29 (2): 38-47.
  • 2[2]Matthew J Moyer, Mustaque Ahamad. Generalized Role-Based Access Control [J]. Proceedings-International Conference on Distributed Computing Systems, 2001, (4): 391-398.
  • 3[3]Sandhu R S,et al. Role-Based Access Control: A Multi-dimensional View[J]. Annual Computer Security Applications Conference, 1994, (12) :54-62.
  • 4Sandhu R S, Samarati P. Access control: principles and practice. IEEE communications. 1994, 32(9): 40-48
  • 5Sandhu R S, Coyne E J, Feinstein H L. Role-based access control models IEEE Computer, 1996, 29 (2) :38-47
  • 6Nyanchama M, Osborn S. Access rights administration in role-based security systems. Proceedings of the IFIP WG11. 3 Working Conference on Database Security,1994, 60(8): 37-56
  • 7陈传波,陈南平.基于代理签名的数字认证方案[J].华中科技大学学报(自然科学版),2001,29(11):35-36. 被引量:1

共引文献73

同被引文献2

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部