西藏地热资源及地热发电的现状与发展 被引量:10

Present Status and Development of Geothermal Power Generation and Geothermal Resources in Xizang
下载PDF
导出
摘要 西藏电力工业发展较快,装机容量已达311 MW,年发电量658 亿k W·h 。地热资源丰富。地热发电开发较早是西藏电力工业的一个重要特点。羊八井地热电站装机容量为24 MW,年发电量已达11 亿k W·h 。 Electric power industry in Xizang develops rapidly.The installed capacity had hit 311 MW with annual electricity generation of 658 GW·h by the end of 1998.Xizang is abundant in geothermal resources.Geothermal power,exploited comparatively earlier,is a main constituent of electric power industry in Xizang.Yangbajing Geothermal Power Plant is the largest one in China, its installed capacity has reached 24 MW with annual electricity generation of 110 GW·h.
出处 《中国电力》 CSCD 北大核心 1999年第10期79-81,共3页 Electric Power
关键词 地热资源 地热发电 地热田 geothermal resources geothermal power generation geothermal fieldrsity, Nanjing, 210096 ChinaABSTRACT In this paper the thermal engineering systems are divided into several typical components, such as pipe, turbomachine, coal fired fluidiz
  • 相关文献

参考文献6

二级参考文献16

共引文献81

同被引文献155

引证文献10

二级引证文献60

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部