3[4]Neely A, Gregory, M. Platts K: Performance measurement system design: a literatute review and research agenda[J].International Journal of Operations & Production Management, 1995,15(4).
6Stephens, Scott. The Supply Chain Council and the Supply Chain Operations Reference (SCOR)Model [J]. Logistics Spectrum, 2000,34(3):16-18.
7Brewer P C. and Speh T W. Using the balanced scorecard to measure supply chain performance [J]. Journal of Business Logistics,2000, 21 (1): 75-93.
8Kaplan R S, Norton D P. The balanced scorecard- measures that drive performance [J].Harvard Business Review, 1992, (Jan.-Feb.):71-79.
9Edward A Morash. Supply chain strategies,capabilities, and performance [J].Transportation journal, 2001, (fall): 37-55.
10Ron Basu. New criteria of performance manageement: A transition from enterprise to collaborative supply chain [J]. Measuring Business Excellence, 2001, 5(4): 7-13.