辽开高速公路路基桥涵工程施工组织的动态优化 被引量:1

Dynamic Optimization for Bridge Engineering Construction Organization of Liao-Kai Expressway Subgrade
下载PDF
导出
摘要 高速公路工程建设的施工组织是决定能否按期完成工程任务的关键因素之一,其中路基桥涵工程的施工组织是众多建设分项中的重中之重。结合辽开高速公路的工程管理实际,重点介绍该项目如何通过动态管理克服了种种不利因素,不断优化施工组织方案,以完成路基桥涵工程建设任务。 The construction organization of expressway engineering construction is one of the key factors to determine whether the engineering can be completed on schedule,thereinto,the construction organization of subgrade bridge engineering is the most important factors in construction sub-items.Combined with the engineering management practice of Liao-Kai expressway,how to overcome the negative factors through dynamic management is introduced in detail in order to optimize construction organization schemes and to complete the construction of subgrade bridge engineering.
作者 冯卫东
出处 《北方交通》 2011年第5期71-73,共3页 Northern Communications
关键词 高速公路 施工组织 优化 Expressway Construction organization Optimization
  • 相关文献

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部