摘要
桥梁满堂红支架现浇是常用的施工方法之一,其稳定性关乎主体结构质量和安全。通过对30m混凝土预应力箱梁+60mT型刚构箱梁满堂红碗扣式支架的设计验算,为同类结构施工提供了有益的参考。
The cast-in-place of bridge full framing is one of the common construction methods and its stability concerns to the structure quality and safety of main body.The design check for bowl type full framing of 30m pre-stressed box girder and 60m T-type rigid frame box girder provides the reference for the similar structure construction.
出处
《北方交通》
2011年第5期84-87,共4页
Northern Communications
关键词
混凝土预应力箱梁
T型刚构箱梁
满堂支架
设计
Pre-stressed box girder
T-type rigid frame box girder
Full framing
Design