某废水处理站改造前采用传统氢氧化物沉淀工艺处理高浓度含铬、氰镉电镀废水,运行不稳定,出水不能达标排放。工艺改造后增加了高分子重金属捕集沉淀剂DTCR辅助去除重金属,在含铬废水DTCR投加量为50 mg/L、含氰镉废水DTCR投加量为10 mg/L条件下,出水总铬、镉分别稳定在0.5 mg/L、0.2 mg/L以下,远低于《电镀污染物排放标准》(GB 21900—2008)限值。
Before reconstruction project,some wastewater treatment station used the traditional hydroxide precipitation process to treat electroplating wastewater which containing high concentration chromium and cadmium cyanide,but the treatment effect was not stable and effluent could not meet the discharge standards.After improvement,the polymer heavy metal chelating agent DTCR was used to help heavy metal removal.When the DTCR dosage for chromium wastewater and cadmium cyanide wastewater were 50 mg/L and 10 mg/L respectively,the total chromium,cadmium in effluent were stabilized below 0.5 mg/L and 0.2 mg/L respectively,which was far below the standards of Emission standard of pollutants for electroplating(GB 21900—2008).
出处
《给水排水》
CSCD
北大核心
2011年第6期54-57,共4页
Water & Wastewater Engineering
关键词
电镀废水
DTCR
沉淀
重金属
铬
氰镉
Electroplating wastewater
DTCR
Precipitation
Heavy metal
Chromium
Cadmium cyanide