图纸设计类企业员工工作负荷的一种统计方法
摘要
本文主要针对图纸设计类企业员工的工作特点,对其工作内容进行分解、细化,从而得出能够客观反映人员工作负荷的量化值。
出处
《内蒙古科技与经济》
2011年第8期32-33,共2页
Inner Mongolia Science Technology & Economy
二级参考文献6
-
1Feitelson D G.Packing Schemes for Gang Scheduling[C]//Proc.of Workshop on Job Scheduling Strategies for Parallel Processing,1996:89-110.
-
2Ernemann C,Hamscher V,Schwiegelshohn U.et al.On Advantages of Grid Computing for Parallel Job Scheduling[C]//Proc.of 2nd IEEE/ACM International Symposium on Cluster Computing and the Grid,2002:31-38.
-
3Subramani V,Kettimuthu R,Srinivasan S,et al.Distributed Job Scheduling on Computational Grids Using Multiple Simultaneous Requests[C]//Proc.of the 11th IEEE International Symposium on High Performance Distributed Computing,2002:359-366.
-
4Shan Hongzhang,Leonid O,Rupak B.Job Superscheduler Architecture and Performance in Computational Grid Environments[C]//Proc.of ACM/IEEE SC'03 Conference,2003:44-58.
-
5Lublin U,Feitelson D.The Workload on Parallel Supercomputers:Modeling the Characteristics of Rigid Jobs[EB/OL].2003-12-03.http://citeseer.nj.nec.corn/lublin01workload.html.
-
6Mu'alem A W,Feitelson D G.Utilization,Predictability,Workloads,and user Runtime Estimates in Scheduling the IBM SP2 with Backfilling[J].IEEE Transactions on Parallel and Distributed Systems,2001,12(6):529-543.
-
1探析房地产开发项目中的造价管理[J].经济技术协作信息,2014(16):89-89.
-
2刘高倬.积极探索和创新公司治理[J].军工文化,2013(5):14-17.
-
3赵建国.物业管理应从图纸设计开始[J].中国物业管理,2008(6):58-59.
-
4王德周.提高建筑工程质量浅议[J].青年记者,2009(6Z):128-128.
-
5王彩华,吴剑锋.秦皇岛市勘察设计类企业信息化发展模式研究[J].经济研究导刊,2017(12):178-178.
-
6刘潇.建筑工程管理中的质量控制[J].产业与科技论坛,2012,11(1):240-241. 被引量:2
-
7汪伟.制造企业基业常青的源泉——产品创新(十一):产品设计的确认和投放[J].CAD/CAM与制造业信息化,2011(9):8-9.
-
8包琨.怎样管理好一个工程项目[J].经济技术协作信息,2013(11):32-32.
-
9杨业会.工程建设项目设计阶段管理分析[J].青岛远洋船员学院学报,2003,24(4):32-35. 被引量:3
-
10程仁文.设计阶段的房地产成本控制[J].科学与财富,2013(7):39-39.