Profit-Based Optimal Operation of a Head-Dependent Hydroelectric Power Station in the Bilateral Market
Profit-Based Optimal Operation of a Head-Dependent Hydroelectric Power Station in the Bilateral Market
参考文献17
-
1M. Shahidehpour, H. Yamin, Z. Li, Market Operations in Electric Power Systems: Forecasting, Scheduling, and Risk Management, John Wiley and Sons, NY, 2002.
-
2L.A.F.M. Ferreira, S.J.P.S. Mariano, V.M.F. Mendes, Production scheduling: Regulation or deregulation?. - back to a theoretical basis, in: International Conference on Electric Utility Deregulation and Restructuring, and Power Technologies, 2000, pp. 655-659.
-
3L.A.F.M. Ferreira, S.J.P.S. Mariano, V.M.F. Mendes, Restructuring models - A comparison based on numerical simulation results, in: IEEE PES Summer Meeting, 2000, pp. 2189-2194.
-
4O.B. Fosso, A. Gjelsvik, A. Haugstad, B. Mo, I. Wangensteen, Generation scheduling in a deregulated system, the Norwegian case, IEEE Transactions on Power Systems 14 (1) (1999) 75-80.
-
5J.P.S. Catal~o, S.J.P.S. Mariano, V.M.F. Mendes, L.A.F.M. Ferreira, Scheduling of head-sensitive cascaded hydro systems: A comparison based on numerical simulation results, in: 4th IASTED International Conference on Power and Energy Systems, 2004.
-
6R.A. Ponrajah, J. Witherspoon, F.D. Galiana, Systems to optimise conversion efficiencies at Otanrio hydro's hydroelectric plants, Transactions on Power Systems 13 (3) (1998) 1044-1050.
-
7S. Mariano, J. Catalao, V. Mendes, L. Ferreira, Power generation efficiency improvement in cascaded and head-dependent reservoirs, in: 15th Power Systems Computation Conference, 2005.
-
8R. Tiainen, T. Lindh, J. Ahola, M. Niemela, V. Sakimaki, Energy price-based control strategy of a small-scale head-dependent, hydroelectric power plant, in: International Conference on Renewable Energies and Power Quality, 2008.
-
9A.I. Cohen, V.R. Sherkat,, Optimisation-based methods for operations scheduling, Proceedings of the IEEE 75 (12) (1987) 1574-1591.
-
10P. Nordlund, D. Sjelvgren, M.V.F. Pereira, J.A. Bubenco, Generation expansion planning for systems with a high share of hydro power, IEEE Transactions on Power Systems 2 (1) (1987) 161-167.
-
1柏岭.电厂仿真机的多种用途[J].电力情报,1996(2):73-76.
-
2刘宝忠,李赫,丁化销.二分之三接线的优化操作探析[J].中国电力教育(下),2012(7):146-146.
-
3电力科技信息[J].中国电力,2004,37(1):61-61.
-
4阮继飞.谈水电施工中机电安装出现的问题及对策[J].青年科学(下半月),2014(1):29-29.
-
5中央空调:半数企业“不正规”[J].家电科技(维修与培训),2004(10):16-17.
-
6郭浩钢,杨媛媛.110kV变电站电压无功的优化控制对策[J].华东科技(学术版),2013(9):153-153.
-
7张永平,焦连伟,倪以信,文福拴,陈寿孙,吴复立.区域电力市场双边交易阻塞管理实用计算方法[J].电力系统自动化,2003,27(14):18-22. 被引量:10
-
8赵莉,傅海浩,杨明明,陈燎原.仿真培训系统在电厂中的应用[J].华电技术,2014,36(11):33-36.
-
9奢侈品中国二三线城市最赚钱[J].中国制衣,2012(6):10-10.
-
10Toshiaki Suzuki,Toshiaki Kanemoto.On-Cam Operation of Counter-Rotating Type Hydroelectric Unit[J].Journal of Energy and Power Engineering,2013,7(10):1966-1973. 被引量:1