全连铸电炉炼钢厂的年生产能力分析 被引量:2

Analysis of Annual Capacity of EAF Steel Plant with Continuous Casting Rate of 100 %
下载PDF
导出
摘要 结合全连铸电炉(长材型)炼钢厂的3 种典型车间平面布置情况讨论了钢厂年生产能力与电炉出钢—出钢时间、连浇炉数的关系。结果表明:电炉与连铸机的配合方式制约着钢厂年生产能力的发挥,年生产能力所能达到的最大值取决于车间平面布置,可据此选择电炉与连铸机的最佳配合方式和车间平面布置方式。 The influences of the interval between two tappings of EAF and heat number of series continuous casting on annual capacity are discussed, linking up with the three typical layouts of EAF steel plant for long products with continuous casting rate of 100 %. The result shows that the matching mode of EAF and CC rules the plant annual capacity, and the layout limits its maximum. According to this, the best matching mode of EAF and CC and plant layout can be selected.
出处 《钢铁研究学报》 CAS CSCD 北大核心 1999年第5期16-20,共5页 Journal of Iron and Steel Research
基金 国家自然科学基金
关键词 电炉炼钢厂 多炉连浇 生产能力 炼钢 EAF steel plant,series continuous casting,capacity
  • 相关文献

参考文献2

  • 1王英群.全连铸电炉(长材型)炼钢厂的过程多维物流解析:(学位论文)[M].北京:北京科技大学,1998..
  • 2王英群,学位论文,1998年

同被引文献9

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部