摘要
根据青岗坪斜井通过强含水层综合技术措施的实践及涌水状况的分析,得出普通法综合防治水技术措施具备的主要条件,为在相似地质水文条件下,应优先选择普通法施工提供成功的实例。
Based on the analysis of the mine inflow conditions and the practice of comprehensive control mine water technique for Qing Gang-ping inclined shaft passing through the strong water-bearing strata,the main conditions of technique are obtained to control the mine water comprehensively by applying the general method.And it provides the successful example prior to selecting the general method to construct for the similar hydro-geological conditions.
出处
《煤炭技术》
CAS
北大核心
2011年第6期152-154,共3页
Coal Technology
关键词
斜井
强含水层
综合防治水
inclined shaft
strong water-bearing strata
comprehensive control mine water