期刊文献+

基于粒子群算法的资源受限项目扩展调度方法

An Extended Scheduling Approach Based on Swarm Optimization Algorithm to Resource-constrained Project Scheduling Problem
下载PDF
导出
摘要 针对资源受限的项目调度问题,提出了一种离散粒子群算法与扩展调度机制相结合的优化方法.离散粒子群算法中每个粒子的位置代表一组项目任务的优先权,迭代中通过交叉策略和局部搜索策略来更新粒子的位置,这既保持了粒子位置的离散性,又增加了粒子的多样性,避免早熟收敛.每个粒子的位置通过扩展串行调度机制转换成可行的调度方案.实算表明,扩展调度机制的引入显著地加速了收敛的进程,提高了解的精度.这种基于粒子群算法的扩展调度优化方法是求解资源受限项目调度问题的有效方法. To solve the resource-constrained project scheduling problem(RCPSP),an optimization algorithm combined discrete particle swarm optimization(DPSO) with extended serial scheduling scheme is presented.In DPSO the location of each particle represents priorities of activities.Cross strategy and local search technology are adopted when updating the particle positions,which can ensure discreteness,increase the diversity of particles and avoid premature during iteration.The location of each particle is transformed to a feasible schedule by the extended serial scheduling scheme.The actual calculation shows that extended scheduling scheme can accelerate the convergence process obviously and improve the precision.It can be concluded that this algorithm is valid for RCPSP.
作者 孙晓雅 林焰
出处 《微电子学与计算机》 CSCD 北大核心 2011年第6期70-73,共4页 Microelectronics & Computer
关键词 资源受限项目调度 离散粒子群算法 扩展串行调度 Resource-constrained Project Scheduling(RCPSP) Discrete Particle Swarm Optimization(DPSO) Extended Serial Scheduling Scheme
  • 相关文献

参考文献8

二级参考文献52

  • 1张雯,杨春明,罗雪春.改进的粒子群优化算法(英文)[J].微电子学与计算机,2007,24(2):70-72. 被引量:11
  • 2王巍,赵国杰.粒子群优化在资源受限工程调度问题中的应用[J].哈尔滨工业大学学报,2007,39(4):669-672. 被引量:11
  • 3单汨源,吴娟,吴亮红,刘琼.基于改进粒子群算法的资源受限项目进度研究[J].计算机工程与应用,2007,43(15):26-28. 被引量:3
  • 4Blazewicz J,Lenstra J K,Rinooy Kan A H G.Scheduling subject to resource constraints:Classification and complexity[J].Discrete Applied Mathematics, 1983,5 ( 1 ) : 11-24.
  • 5Hartmann S,Kolisch R.Experimental evaluation of state-of-the-art heuristics for the resource constrained project scheduling problem[J]. European Journal of Operational Researeh, 2000,127 (2) : 394--407.
  • 6Demeulemeester E,Herroelen W.Project scheduling--a research handbook[M].Boston:Kluwer Academic Publishers,2002.
  • 7Kolisch R,Hartmann S.Experimental investigation of heuristics for resource-constrained project scheduling:An up date[J].European Journal of Operational Research, 2006,174( 1 ) : 23-37.
  • 8Kennedy J,Eberhart R.Particle swarm optimization[C]//Proceedings of IEEE International Conference on Neural Networks.New York: IEEE, 1995,4: 1942-1948.
  • 9Zhang Hong,Li Xiao-dong,Li Heng.Particle swarm optimization- based schemes for resource-constrained project scheduling[J].Automation in Construction,2005,14(3):393-404.
  • 10Hartmann Sonke.A competitive renetic algorithm for resource-constrained project scheduling[J].Naval Research Logistics,1998,45: 733-750.

共引文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部