摘要 以全预制装配式混凝土结构项目———中南世纪城33号楼工程为例,阐述全预制装配整体式剪力墙结构浆锚节点施工技术及质量控制。重点介绍了图纸深化设计、构件加工、构件注浆管预埋、拼缝模板支设、注浆管内喷水湿润、搅拌注浆料、注浆管内孔灌浆、构件表面清理、注浆口管表面填实压光等。随后对浆锚节点进行随机剥离和拉拔试验,其管内注浆料密实;对钢筋进行拉拔试验,母材钢筋全部拉断,浆锚节点内未见松动,结果良好。 Taking Zhongnan Century City project for example, the construction technology and quality control of slurry and anchor joint in the new precast concrete shear wall structure are indicated. The deep design of drawings, components processing, grouting pipe embedding, formwork setting, water-jet and wetting in grouting pipe, grouting material mixing, inner hole grouting, apparent cleaning of components, apparent filling and calendering of grouting opening are introduced in detail. Furthermore, the random stripping and tensioning experiments for slurry and anchor joint were carried out, the results show that the grouting material is compacting. Meanwhile, the tensioning experiment was carried out for steel bars, the results show that the base material is broken, but it has no loosening in slurry and anchor joint.
出处 《施工技术》 CAS 北大核心 2011年第6期10-12,共3页 Construction Technology
基金 住房和城乡建设部"2009年科学技术项目计划--研究开发项目(新型建筑结构技术)"(2009-K2-20)
关键词 全预制装配整体式剪力墙 浆锚节点 质量控制 the new precast concrete shear wall slurry and anchor joint quality control
  • 相关文献

参考文献6

  • 1中国建筑科学研究院.GB50300-2001建筑工程施工质量验收统一标准[S].北京:中国建筑工业出版社,2001.
  • 2中国建筑科学研究院.GB50204-2002混凝土结构工程施工质量验收规范[S].北京:中国建筑工业出版社,2002.
  • 3中国建筑股份有限公司,中建三局建设工程股份有限公司.JGJ169-2009清水混凝土应用技术规程[s].北京:中国建筑工业出版社,2009.
  • 4建筑施工手册(4版)[M].北京:中国建筑工业出版社,2003.
  • 5张军,侯海泉,董年才,陈洪杰,郭正兴.全预制装配整体式剪力墙结构住宅施工技术[J].施工技术,2010,39(7):96-98. 被引量:33
  • 6张军,侯海泉,董年才,龚俊杰,郭正兴.全预制装配整体式剪力墙住宅结构设计及应用[J].施工技术,2009,38(5):22-24. 被引量:41

共引文献280

同被引文献54

引证文献12

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部