摘要 针对当前火电厂凝结水泵高压变频改造现状,从"电气改造方案"、"保护功能"、"控制策略"三个方面,阐述了改造应注意的问题。并以广安电厂600 MW机组凝结水泵高压变频改造为例,论证了注意这三方面问题的必要性和可行性。 Aiming at the current reforming situation of high-voltage frequency conversion of condensate pump in thermal power plants,as viewed from the electrical reforming scheme,protection function and control strategy,the problems needing attention in the reforming are described.Taking high-voltage frequency conversion reforming of condensate pump of 600 MW units in Guang'an Power Plant for example,the necessity and feasibility of the above-mentioned three aspects are demonstrated.
作者 郭伯春
出处 《四川电力技术》 2011年第3期87-91,共5页 Sichuan Electric Power Technology
关键词 凝结水泵 高压变频 改造 电气 保护 控制策略 condensate pump high-voltage frequency conversion reforming electricity protection control strategy
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部