地铁盾构施工风险评估与风险规避研究 被引量:9

Study on risk assessment and avoiding of metro shielding construction
下载PDF
导出
摘要 深圳地铁二号线2202标段包括科苑站—红树湾站—世界之窗站,大部分采用盾构法施工。盾构隧道处于砂质粘性土地层填海地层,下穿4栋高尔夫别墅,存在基岩隆起、孤石和易出现施工扰动等情况。对2202标盾构施工进行安全评估,指出盾构机选型、盾构机进出洞及盾构施工过程中的风险源,如始发方向失控、盾尾卡死、洞口土体坍塌、地面建筑物出现不均匀沉降等,进而强调在施工过程中要正确辨识风险源,并根据地质、水文和周围环境条件研究采取适当的规避风险措施。 The bid section 2202 of Shenzhen metro line 2 included KeYuan station,Hongshuwan station and Shijiezhichuang station,and most of them were constructed by shielding method.The shielding tunnel lied in the sandy clay stratum and Reclamation stratum,and 4 golf villas would be crossed,so bedrock uplift,boulder and disturbance might easily occurred.Safety evaluation on bid section 2202,the risk in shield machine selection,passing in and out of the tunnel were pointed out,such as soil collapse,uneven settlement of construction,so as to emphasize how to make the risk identification directly and take the measure correctly according to geological hydrological condition and environment surrounding to avoid the risk.
作者 牛康
出处 《中国安全生产科学技术》 CAS 北大核心 2011年第5期42-46,共5页 Journal of Safety Science and Technology
关键词 深圳地铁 盾构施工 风险评估 风险规避 Shenzhen metro shielding construction risk assessment risk avoiding
  • 相关文献

参考文献8

二级参考文献21

共引文献95

同被引文献70

引证文献9

二级引证文献60

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部