期刊文献+

独立式风光互补路灯系统优化 被引量:3

Optimization of Stand-alone Hybrid Wind-solar Streetlight System
下载PDF
导出
摘要 在保证风光互补照明系统正常工作的条件下,系统的技术经济性分析对减少全寿命费用和年运行费用,提高投资效益是非常必要的。利用HOMER软件对独立式风光互补路灯系统进行了技术经济性分析,根据当地气象资料,找到了满足系统正常工作的最佳系统配置,并分析了不可预测的敏感性变量如风电机组寿命、年平均风速和银行利率对系统全寿命费用的影响。优化结果表明技术经济性分析可以使系统投资最少,收益最大。 The techno-economic analysis for hybrid wind-solar lighting system is important to decrease the total net present cost and operating maintain cost and improves the investment yield under the regular work conditions of power supply system.The HOMER software is used to analyze the techno-economic performances of hybrid wind-solar streetlight system in accordance with the local weather data,the optimized configuration of supply system is gained which can satisfy the regular supply power demand.Furthermore,the unpredictable sensitivity variables affect the total net present cost of system,such as the life of wind power turbine,the effects of annual average wind speed and interest rate on the systematic full-life cost.The optimal results indicate that the techno-economic analysis can minimize the net present cost and maximize investment yield.
出处 《太原科技大学学报》 2011年第3期167-171,共5页 Journal of Taiyuan University of Science and Technology
基金 山西省青年科技研究基金(2009021020) 山西省高等学校科技研究开发项目(2010016) 太原市大学生创新创业项目(100115165)
关键词 风光互补照明系统 技术经济性分析 运行维护费用 全寿命费用 荷马 hybrid wind-solar streetlight techno-economic analysis total operating and maintain cost total net present cost homer
  • 相关文献

参考文献9

  • 1DIAF S,DIAF D,BELHAMEL M,HADDADI M,LOUCHE A.A methodology for optimal sizing of autonomous hybrid PV/wind system[J].Energy Policy,2007,35 (11):5708-5718.
  • 2YANG HONGXING,LU LIN,ZHOU WEI.A novel optimization sizing model for hybrid solar-wind power generation system[J].Solar Energy,2007,81 (1):76-84.
  • 3YANG HONGXING,LU IN,FANG ZHAOHONG,ZHOU WEI.Optimal sizing method for stand-alone hybrid solar-wind system with LPSP technology by using genetic algorithm[J].Solar Energy,2008,82(4):354-367.
  • 4MILLS A,Al-HALLAJ S.Simulation of hydrogen-based hybrid systems using Hybrid2[J].International Journal of Hydrogen Energy,2004,29 (10):991-999.
  • 5LQBAL M T.Pre-feasibility study of a wind-diesel system for St.Brendan's,Newfoundland[J].Wind Engineering,2003 ;27 (1):39-51.
  • 6REHMAN S,EI AMIN I M,AHMAD F,SHAAHID S M,Al SHEHRI A M,BAKHASHWAIN J M,SHASH A.Feasibility study of hybrid retrofits to an isolated off-grid diesel power plant[J].Renewable and Sustainable Energy Reviews,2007,11 (4):635-653.
  • 7HIMRI Y,BOUDGHENE STAMBOULI A,DRAOUI B,HIMRI S.Techno-economical study of hybrid power system for a remote village in Algeria[J].Energy,2008,33 (7):1128-1136.
  • 8EYAD S HRAYSHAT.Techno-economic analysis of autonomous hybrid photovoltaic-diesel-battery system[J].Energy for Sustainable Development,2009,13 (3):143-150.
  • 9方燕,马金花,高善峰,张从菊.风光互补路灯系统的优化设计方法[J].可再生能源,2009,27(1):88-92. 被引量:14

二级参考文献3

共引文献13

同被引文献35

  • 1戴嘉彤,董海鹰.基于抽水蓄能电站的风光互补发电系统容量优化研究[J].电网与清洁能源,2019,35(6):76-82. 被引量:24
  • 2周志敏,纪爱华.风光互补发电实用技术:工程设计、安装调试、运行维护[M].北京:电子工业出版社,2011:145-149.
  • 3BARTON J P, INFIELD D G. A probabilistic method for calculat- ing the usefulness of a store with finite energy capacity for smooth- ing electricity generation fi'om wind and solar power [J].J Power Sources, 2006,162(2): 943-948.
  • 4CHEN H,CONG T N,YANG W,et al. Progress in energy storage system:a critical review [J]. Progress in Natural Science, 2009, 1-9(3).291-312.
  • 5ARABALI A, GHOFRANI M, ETEZADI-AMOLI M, et al. Genet- ic-algorithm-based optimization approach for energy management . IEEE Transactions on Power Delivery, 2013,28(1): 162-170.
  • 6SURESHKUMAR U,MANOHARAN P S,RAMALAKSHMI A P S. Economic cost analysis of hybrid renewable energy system using HOMER[C]//Intemational Conference on Advances in En- gineering, Science and Management, Nagapattinam:IEEE,2012: 94-99.
  • 7WEE K W,CHOI S S,VILATHGAMUWA D M. Design of a least-cost battery-supercapacitor energy storage system for realiz- ing dispatchable wind power [J]. IEEE Transactions on Sustain- able Energy, 2013,4(3): 786-796.
  • 8方燕,马金花,高善峰,张从菊.风光互补路灯系统的优化设计方法[J].可再生能源,2009,27(1):88-92. 被引量:14
  • 9高飞,李建玲,赵淑红,王子冬.锂动力电池寿命预测研究进展[J].电子元件与材料,2009,28(6):79-83. 被引量:15
  • 10谈蓓月,卫少克.风光互补发电系统的优化设计[J].上海电力学院学报,2009,25(3):244-248. 被引量:25