摘要
宝钢二炼钢2台275t转炉均停吹后,蒸汽量不能满足剩下的最后1包钢水进行RHKTB处理,针对此问题进行分析。
After the blowout of both 275t converters in Baosteel,the last vessel of molten steel could not be supplied with enough steam in RH KTB process.It is suggested that the raise of the release pressure of the steam accumulator of the LT gas cooling system would be an effective way to solve this problem.
出处
《宝钢技术》
CAS
1999年第4期47-49,共3页
Baosteel Technology