1000MW水轮发电机组研究新进展 被引量:4

New Research Development of 1000 MW Hydro-generator Units
原文传递
导出
摘要 金沙江下游河段规划中的乌东德、白鹤滩电站经过工程预可研和可研论证,具备装设单机容量1 000MW机组的条件。对1000MW水轮发电机组设计制造及工程应用技术可行性研究新进展进行了总结,并指出了下阶段研究的重点。研究结果表明:立足国内技术,乌东德、白鹤滩1000MW水轮发电机组的设计、制造、运输是可行的,不存在大的制约因素。 The planned hydro-power projects of Wudongde and Baihetan in the lower reach of Jinshajiang River are to be built soon after the pre-feasibility and feasibility study,where the single-machine capacity can reach to 1 000 MW.The new development for the feasibility research on design,manufacture and engineering application technology are summarized for 1 000 MW hydro-generator units,and the research emphases for the next stage presented.Based on the domestic technology,the studies show that it is feasible to design,manufacture and transport of 1 000 MW hydro-generator units in Wudongde and Baihetan,without big constraints existing.
出处 《电力建设》 2011年第6期62-66,共5页 Electric Power Construction
关键词 1000Mw水轮发电机组 发电机 可研论证 装机容量 1000 MW hydro-generator units generator feasibility study installed capacity
  • 相关文献

参考文献12

  • 1华东勘测设计研究院.金沙江白鹤滩水电站预可行性研究报告[R].杭州:华东勘测设计研究院,2004.
  • 2华东勘测设计研究院.金沙江白鹤滩水电站装设百万机组可行性研究报告[R].杭州:华东勘测设计研究院,2007.
  • 3长江勘测规划设计研究院.金沙江乌东德水电站装设百万机组可行性研究报告[R].武汉:长江勘测规划设计研究院,2007.
  • 4中国长江三峡集团公司.大型混流式水轮发电机组调查总结报告[R].宜昌:中国长江三峡集团公司,2009.
  • 5哈尔滨电机厂有限责任公司.金沙江白鹤滩1000MW机组水轮机水力开发报告[R].哈尔滨:哈尔滨电机有限责任公司,2009.
  • 6哈尔滨电机厂有限责任公司.金沙江白鹤滩1000MW机组总体设计报告[R].哈尔滨:哈尔滨电机厂有限责任公司,2009.
  • 7哈尔滨电机厂有限责任公司.金沙江乌东德1000MW机组水轮机水力开发报告[R].哈尔滨:哈尔滨电机厂有限责任公司,2009.
  • 8哈尔滨电机厂有限责任公司.金沙江乌东德1000MW机组总体设计报告[R].哈尔滨:哈尔滨电机厂有限责任公司,2009.
  • 9东方电机有限公司.金沙江白鹤滩1000MW机组水轮机水力开发报告[R].德阳:东方电机有限公司,2009.
  • 10东方电机有限公司.金沙江白鹤滩1000MW机组总体设计报告[R].德阳:东方电机有限公司,2009.

同被引文献34

引证文献4

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部