摘要
本文介绍了一个计算机辅助管理系统.该系统利用 MRP 方法,较成功地实现了投料计算和产量监督计算机化.文中着重讨论了根据毛纺生产管理特点对 MRP 方法所作的一些修改.
In this paper is introducted a computer aided management system.By using the MRPmethod,we succeeded in computerization of material requirement computing and outputsupervising in the system.The entphasis of this paper is about the modification to theMRP method based on the characteristic of the woolen cloth production management.
关键词
计算机管理
毛纺
材料
需求计划
MRP(Material Requirements Planning)
MIS(Management Information System).