摘要
某冰蓄冷工程蓄冰槽防水层与保温层都已失效,需重新设计施工。本文分析了该蓄冰槽防水保温层失效的原因,提出了对其进行综合治理的技术措施,通过工程施工应用,证明治理效果良好。
Both waterproofing courses and insulation of a cold storage tank are failure to work and reconstruction is needed.The article analyses the causes for the failure and recommends comprehensive technical measures,which are operational with good results in the work.
出处
《中国建筑防水》
2011年第12期27-29,共3页
China Building Waterproofing
关键词
冰蓄冷工程
蓄冰槽
聚脲防水涂料
硬泡聚氨酯
防水保温层
cold storage works
cold storage tank
polyurea waterproofing coating
polyurethane foam
waterproof insulation course