摘要
结合唐山市第三空间综合体深基坑工程,基于FLAC3D软件的弹塑性有限差分分析,对基坑坡顶水平位移实测数据与数值模拟结果进行了对比分析。研究表明:土钉和预应力锚索相结合的复合土钉支护方法,能够较好地控制基坑变形的发展。该工程的成功实施,对今后类似工程具有较大的借鉴价值。
Through an elastic-plastic analysis of FLAC3D program based on the explicit difference method,and from the case of urban complex of the third space deep excavation project in Tangshan on composite soil nailing combined with general soil nail and prestressed anchor.Numerical simulation is carried out and the horizontal displacement on the top of pit foundation,with measured date is discussed.The analysis shows that the composite soil nailing can largely restrain the pit foundation deformation.The successful application provides useful reference to similar projects in future.
出处
《河北农业大学学报》
CAS
CSCD
北大核心
2011年第3期103-107,共5页
Journal of Hebei Agricultural University
关键词
深基坑
复合土钉
预应力锚索
数值模拟
现场测试
水平位移
deep excavation
composite soil nailing
prestressed anchor
numerical anchor
field testing
horizontal displacement