以某公司罐式煅烧炉为研究对象,分析了采用高硫焦替代部分低流焦的可行性,找出了高低硫焦使用的最佳配比。介绍了高低硫焦煅烧过程存在的问题以及采取的措施。
The pot calciner in a company was studied,the feasibility replacing partial low sulphur coke with high sulphur coke was analyzed,and their optimum proportion was found.The problems of high and low sulphur coke existed in calcinations process and their corresponding solutions were introduced.
出处
《有色冶金节能》
2011年第3期23-25,共3页
Energy Saving of Nonferrous Metallurgy
关键词
高硫焦
低硫焦
煅烧炉
生产
应用
high sulphur coke
low sulphur coke
calciner
production