摘要
针对地铁在"Y"形线路交汇点的运行冲突问题,具体结合杭州地铁1号线工程九堡东站实际配线,定义交汇点和交汇区域,介绍"Y"形线路交汇点运行冲突信号系统调整的几种方法,举例说明实际"Y"形线路一个分支列车晚点对另一个分支列车的影响。
Combining with the practical wiring of Jiubao East Station in Hangzhou metro line 1 project,the junction point and junction area are defined.The several methods for signal system adjustment of operation conflict in junction point of Y-type line are introduced.The effects of one branch train delay on another branch train in practical Y-type line are illustrated.
出处
《现代城市轨道交通》
2011年第3期79-81,118,共3页
Modern Urban Transit