摘要
以2010年中国石化参与的科威特液化石油气罐区总承包项目投标为例,预估了项目的投标价格、风险及风险应对策略,讨论价格与风险的杠杆平衡关系。
Using the bid for Kuwait's LPG tank zone overall contract project which Sinopec took part in in 2010 as an example,the article analyzes the bid price for a project,risks and the strategy to cope with risks and discusses the lever balance of price and risks.
出处
《当代石油石化》
CAS
2011年第5期25-28,50,共4页
Petroleum & Petrochemical Today
关键词
价格
风险
杠杆平衡
决策力
price,risks,lever balance,decision-making ability