期刊文献+

物化预处理—水解酸化—接触氧化法处理选矿废水 被引量:2

Treatment of Flotation Wastewater by Physicochemical Pretreatment-hydrolysis Acidification-biological Contact Oxidation Process
下载PDF
导出
摘要 对某浮选厂浮选废水进行混凝沉淀+活性碳吸附预处理,然后进入生化系统,厌氧池、好氧池停留时间为10h。结果证明:进水COD为400~700 mg/L,出水74~145 mg/L,去除率达75.8%以上,首次成功地将生物法应用到铅锌选矿废水的处理,若对该工艺进行适当调整,完全可以使出水达到排放或回用标准。 Flotation wastewater was treated by the combined processes of physicochemical pretreatment-hydrolysis acidification-biological contact oxidation.The HRT of Anaerobic reactor and Aerobic reactor was 10 hours.The results demonstrated that the concentration of COD decreased from 400~700 mg/L to 74~145 mg/L through the combined processes,the average removal rate was 75.8%.The biological method first successfully apply to the lead-zinc flotation wastewater,if the appropriate adjustment was made for the processes,their effluent could meet the discharge or reuse standard.
出处 《城市环境与城市生态》 CAS CSCD 2011年第3期26-29,共4页 Urban Environment & Urban Ecology
基金 南京铅锌银矿业有限公司资助项目-选矿废水深度生化处理工程设计与研究
关键词 浮选废水 预处理 生物法 停留时间 flotation wastewater pretreatment biodegradation HRT
  • 相关文献

参考文献10

二级参考文献74

共引文献142

同被引文献17

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部