由于交通量增加和经济发展的需要,珠海市原珠港大道需进行快速化升级改扩建(即高栏港高速工程)。其中前锋涌大桥是2003年建成通车的公路桥梁,也是高栏港高速工程的控制性节点工程。
With the rapid development of China's transportation, transforming and reusing the old bridge have become more and more important.Through introducing the application of synchronous jack-up technology in Zhuhai Qianfengyong Great Bridge,the choosing of jack-up scheme,construction technique and monitoring control was mainly expounded,which can provide reference for similar projects.