摘要
指出了港口建设项目“三同时”静态管理存在的主要问题,综述了“三同时”全过程动态管理模式及其优点。
Main problem existed in the static administration of “3 simultaneousness”during the port construction projects is pointed out.The dynamic administration model of “3 simultaneousness” during the whole process and its advantages are discussed.Analysis of Dyna mic Ad ministration in Environ mental protectionduring Const
关键词
建设项目
全过程管理
港口
环境保护项目
Construction project “3 simultaneousness” Whole process Administration