本文给出了一个冷却塔的配水模型试验结果。我国过去多采用槽式配水,现在多采用管式配水。此试验为槽、管结合型,试验结果与原体很一致。由于配水网的复杂性,水力计算很难算准,本文可作为设计计算的参考。
This paper presents the model experimental results about the water distribution in a cooling tower. In the past, the water distribution was conducted commonly with channel nets nowadays it is usually carried out with pipe nets. The present experiment is mixed type of the two. The experimental results are in agreement with those for the prototype. Owing to the complexity of the water distribution system, the hydraulic relaled computation is difficult, and the results, grven herein can be used as a reference.
出处
《水动力学研究与进展(A辑)》
CSCD
北大核心
1999年第3期295-302,共8页
Chinese Journal of Hydrodynamics
关键词
冷却塔
配水
试验研究
配水网
水力计算
cooling tower, water distribution, experimental research.