大顶子山航电枢纽工程电气主接线方案比较

Comparison of electric main wiring scheme for Dadingzishan navigation power junction
下载PDF
导出
摘要 根据电站装机规模及双回66 kV电压接入电力系统的条件,经过综合技术经济比较,最后确定技术上可行,经济上合理的主接线方案。发电机变压器组合采用发电机主变压器组成三机—变扩大单元接线,从两段发电机电压母线上各取一回厂用电电源;66kV侧采用变压器—线路组(带备用断路器)接线。 Based on the installed capacity of hydroelectric power station and the condition of the double circuit transmission of 66kV voltage to connect power system,the paper puts forward the main wiring scheme with viable technology and reasonable economy through the comparison of technology and economy.The scheme is that taking combination of generator and main transformer as three generators and one transformer to expand unit connection,power supply from two voltage buses of generator separately to plant,transformer-line block(back-up circuit breaker) at the side of 66kV.
出处 《东北水利水电》 2011年第6期4-6,71,共3页 Water Resources & Hydropower of Northeast China
关键词 电气主接线 方案选择 航电枢纽 electric main wiring scheme selection navigation power junction
  • 相关文献

参考文献2

  • 1水电站机电设计手册(电气一次)[M].北京:水利电力出版社.1982.
  • 2电力工程电气设计手册(电气一次部分)[M].北京:中国电力出版社,1987.

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部