摘要
介绍了河北华电沽源风电有限公司一期工程安装的1.5MW大型水平轴风力发电机组的结构特点、安装工艺流程、安装工程关键点及试运行前的调试项目,可供相同类型风力发电机组安装时参考。
A 1.5MW large horizontal shaft axis wind turbine generator system was erected in Hebei Huadian Guyuan Wind Power Corporation Limited project phase I.The structure features,erection technological process,the key points of the erection engineering and the debugging terms before commissioning of the wind turbine generator system were introduced;which can be used as reference for erection of similar wind turbine generator system.
出处
《华电技术》
CAS
2011年第6期37-39,82,共3页
HUADIAN TECHNOLOGY
关键词
水平轴风力发电机组
结构
安装
调试
试运行
horizontal axis wind turbine generator system
structure
erection
debug
trial operation