期刊文献+

天津站综合交通枢纽功能需求研究 被引量:1

On Integrated Transportation Hub Functional Demands of Tianjin Railway Station
下载PDF
导出
摘要 天津站综合交通枢纽功能的定位和实现是建立在项目各方的利益需求以及需求满足基础上,因此全面识别与此项目紧密相关的单位或群体并分析他们的各自利益需求,对枢纽功能的定位以及实现至关重要。基于利益相关者理论,通过对天津站综合交通枢纽项目利益相关者的识别、核心利益相关者的确定及其利益需求分析,确定项目的整体功能建设需求,为项目规划设计工作提供了直接有效依据。 Functional achievement of integrated transportation hub of Tianjin Railway Station is reached on the basis of the satisfaction of all parties' interest demands. It's crucial to take a comprehensive identification on the closely related units or groups, and analyze their respective interest demands on the hub. Based on stakeholder theory, this paper identifies project stakeholders of the integrated transportation hub of Tianjin Railway Station, finds the core stakeholders and analyzes their interest demands, finally determines the project functional demands which can provide a direct and effective basis for the planning and design of a project' s construction.
出处 《城市轨道交通研究》 北大核心 2011年第6期1-4,共4页 Urban Mass Transit
基金 国家软科学研究计划项目(2007GXSID074) 天津市科技支撑计划项目(08ZCKFSF01200)
关键词 综合交通枢纽 利益相关者理论 利益需求 功能需求 integrated transportation hub stakeholder theory interest demand functional demand
  • 相关文献

参考文献7

二级参考文献28

  • 1张锋.国内外对项目成功评价标准的研究回顾[J].曲靖师范学院学报,2003,22(6):79-84. 被引量:4
  • 2张慧玲.项目管理对项目取得成功的作用[J].企业管理,1997,(5).
  • 3杨桐.[D].上海:同济大学工程管理研究所,1999.
  • 4Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK Guide) [M]. 1996 Edition. 2001. 6-10.
  • 5Lim C S, Mohamed M Z. Criteria of project success[J]. International Journal of Project Management, 1999, 17:243 -248.
  • 6Atkinson R. Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria[J]. International Journal of Project Management, 1999, 17:337 - 342.
  • 7Westerveld E. The Project Excellence Model: linking success criteria and critical success factors [J]. International Journal of Project Management, 2003, (6) :411 -418.
  • 8AJ SHENHAR.One size does not fit all projects:exploring classical contingency domains[J].Management Science,2001.
  • 9AJ SHENHAR,A TISHLER,D DVIR,S LIPOVETSKY T.Refining the search for project success factors:a multivariate,typological approach[J].R&D Management,2002.
  • 10A K MUNNS,B F BJEIRMI.The role of project management in achieving project success[J].International Journal of Project Management,1996,14(2):81 -87.

共引文献54

同被引文献4

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部