摘要
结合多个变电站一、二次设备改造过程中的安全管理工作,就变电站技改过程中如何加强施工过程安全监管、做好设备投运前的验收把关进行了阐述,旨在为已运行的变电站技改工程的安全管理提供经验借鉴。
Combining the safety management and control process of multiple substation primary and secondary equipment technological modification,how to strengthen safety supervision in the process and how to do the equipment acceptance checks before commissioning during the substation equipment technological transformation process were explained,aimed to apply experiences to technical transformation project of substation operation safety management.
出处
《能源研究与管理》
2011年第2期65-66,共2页
Energy Research and Management
关键词
既有
变电站
技术改造
工程
安全管控
existing
substation
technical transformation
engineering
safety management and control