5Richard D. The next major step in total hands -free pipe handingno derrickman in derrick racking and unracking pipe. IADC/SPE Drilling Conference held in Amsterdam, the Netherlands, 2007 (2): 20-22.
6Reid D. The development of automated drilling rigs. (SPE/IADC 39373 ) . IADC/SPE Drilling Conference Held in Dallas, Texas, 1998 (5) : 3 - 6.
7Jacques M E, Herst N W. Pipe - racking systems: are they cost efficient? (SPE/IADC 21957 ) . SPE/IADC Drilling Conference, Amsterdam, Holland, 1991 (3): 11-14.
8Levett B. Maximizing rig automation safety and efficiency with remote monitoring. (SPE 84169 ) . SPE Annual Technical Conference and Exhibition Held in Denver, Colorado, USA, 2003 (10): 5-8.
9Isinger, Ron. Considerations given to land rig design for versatility of operations. ( SPE/IADC 74453 ) . IADC/ SPE Drilling Conference Held in Dallas, Texas, 2002 (2) : 26 -28.
10Kinzel H. Equipment for mechanized running of tubulars on a fifth - generation semisubmersible - commissioning and field experience. (SPE/IADC 62754) . IADC/SPE Asia Pacific Drilling Technology Held in Kuala Lumpur, Malaysia, 2000 (9): 11-13.
4Xue-jun Hou, De-li Gao, Automatic Control Scheme Design of Onshore Drilling Rig Pipe Handling System, Circuits [C]. 2011 Third Pacific-Asia Conference on Communications and System (PACCS), Wu Han,China,2011.
10Richard D.The next major step in total hands-free pipe handling-No derrickman in the derrick racking and unracking pipe[J].IADC/SPE Drilling Conference, 2007 (2) : 405-408.