摘要
为了解决在铁法煤田复杂的地质条件下,提高综采工作面回采率的问题,大隆矿在S1905大采高工作面尝试了跨断层开采的新工艺,工作面从9#层煤直接跨过落差接近26 m的断层开采到7#层煤,使工作面多向前推进了114 m,多回采原煤15.5万t,这项工艺为综采工作面适应复杂的地质条件,积累了经验,拓宽了综采工作面的应用空间。
In order to improve recovery rate of fully-mechanized face under complex geological conditions in Tiefa Coal Field, a new technology of cross-fault mining on the face of S1905 large mining height was tried in Dalong Coal Mine. Fully-mechanized mining face moved directly from 9^# layers to 7^# layers with nearly 26 meters fault, with a progress of 114 m and recovered raw coal of 155 thousand t. This technology helps accumulate experience for fully-mechanized mining face to adapt to complex geological conditions and widens application space of fully mechanized working face.
出处
《辽宁工程技术大学学报(自然科学版)》
CAS
北大核心
2011年第A01期46-49,共4页
Journal of Liaoning Technical University (Natural Science)
关键词
大采高
跨断层开采
综采工作面
large mining height
cross-fault mining
fully-mechanized mining face