摘要 为了解决在铁法煤田复杂的地质条件下,提高综采工作面回采率的问题,大隆矿在S1905大采高工作面尝试了跨断层开采的新工艺,工作面从9#层煤直接跨过落差接近26 m的断层开采到7#层煤,使工作面多向前推进了114 m,多回采原煤15.5万t,这项工艺为综采工作面适应复杂的地质条件,积累了经验,拓宽了综采工作面的应用空间。 In order to improve recovery rate of fully-mechanized face under complex geological conditions in Tiefa Coal Field, a new technology of cross-fault mining on the face of S1905 large mining height was tried in Dalong Coal Mine. Fully-mechanized mining face moved directly from 9^# layers to 7^# layers with nearly 26 meters fault, with a progress of 114 m and recovered raw coal of 155 thousand t. This technology helps accumulate experience for fully-mechanized mining face to adapt to complex geological conditions and widens application space of fully mechanized working face.
出处 《辽宁工程技术大学学报(自然科学版)》 CAS 北大核心 2011年第A01期46-49,共4页 Journal of Liaoning Technical University (Natural Science)
关键词 大采高 跨断层开采 综采工作面 large mining height cross-fault mining fully-mechanized mining face
  • 相关文献

参考文献4

二级参考文献5

共引文献12

同被引文献50

引证文献8

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部