期刊文献+

重庆朝阳嘉陵江大桥桥墩围堰防渗技术 被引量:4

Research of pier cofferdam of Chongqing Chaoyang Jialing River Bridge
下载PDF
导出
摘要 为了解决重庆朝阳嘉陵江右线大桥1#桥墩施工围堰平台采用片石笼结合编织袋填筑而成,坡度大、渗径短、架空结构严重的问题;本文提出了采用水泥膏浆防渗处理方案。施工结果表明,新型水泥膏浆适合于较大孔隙地层的动水堵漏,是桥墩围堰防渗的一种有效手段,较常规连续墙围堰防渗缩短工期50%以上,可供类似工程参考和借鉴。 In order to solve the fight line of the Jiangling River in Chongqing Chaoyang Bridge pier cofferdam 1# on-chip platform with woven gabion filling made, steep slope, seepage path is short, serious problems of overhead structure; this paper, using cement paste seepage control plan. The results show that the construction of the new cement paste is suitable for large hydrodynamic porous formation plugging, pier cofferdam is an effective means than the conventional diaphragm wall cofferdam shorten the construction period more than 50%, for similar projects reference and reference.
作者 刘旭升
出处 《辽宁工程技术大学学报(自然科学版)》 CAS 北大核心 2011年第A01期120-122,共3页 Journal of Liaoning Technical University (Natural Science)
关键词 桥墩围堰 膏浆 防渗 动水堵漏 pier cofferdam paste thick seepage dynamic water plugging
  • 相关文献

参考文献5

二级参考文献11

共引文献32

同被引文献17

引证文献4

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部