摘要 以杨柳垭滑坡应急处置为例,研究控制推移式滑坡体变形成灾的途径。从变形特征、工程地质、处置过程和工程措施4个方面分析其应急措施。现场监测和数值模拟对各项工程的效果检验表明,推移式滑坡抢险可通过后缘减载、前缘堆载、抗滑桩和地表截排水,进行治理。 The emergency treatment is discussed to illustrate the approach to control the devastation of pushing slopes.It is analyzed in terms of deformation features,engineering geology,engineering measures and disposal process.Field measuring,monitoring and numerical simulation were used to test the effects of the various engineering projects,and the results showed that pushing slopes can be disposed of through back-load reducing,front heap loading,anti-slide piling,surface-water blocking and draining.
作者 肖进
出处 《地质灾害与环境保护》 2011年第2期65-70,共6页 Journal of Geological Hazards and Environment Preservation
关键词 杨柳垭 推移式滑坡 应急处置 数值模拟 Yangliuya pushing slopes emergency treatment numerical simulation
  • 相关文献

参考文献3

二级参考文献3

  • 1黄润秋,许强.工程地质广义系统科学分析原理及应用[M]地质出版社,1997.
  • 2林振山.长期预报的相空间理论和模式[M]气象出版社,1993.
  • 3秦四清等.非线性工程地质学导引[M]西南交通大学出版社,1993.

共引文献117

同被引文献49

引证文献3

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部