期刊文献+

Suitable retention and recovery technology of floor coal at ends of fully mechanized face with great mining heights 被引量:3

Suitable retention and recovery technology of floor coal at ends of fully mechanized face with great mining heights
下载PDF
导出
摘要 Gateways at faces of great mining heights are mostly driven along the roof of coal seams.For gateway height restrictions,a 1-3 m floor coal is retained,leaving a triangular floor coal at the face ends,causing a loss of coal.In order to improve coal recovery rates and to ensure efficiency of equipment at coal mining faces,we investigated suitable retention methods and recovery technology of floor coal at face ends.The upper floor coal can directly be recovered by a shearer with floor dinting.The lower floor coal is recovered by shearer with floor dinting after advanced floor dinting and retaining a step for protecting coal sides in a haulage gateway.Field practice shows that this method can improve the coal recovery rates at fully mechanized working faces with great mining heights. 在大采矿高度的脸的网关主要沿着煤缝接的房顶被驾驶。为网关高度限制, 13 m 地板煤被保留,离开在脸结束的三角形的地板煤,引起煤的损失。为了改进煤恢复率并且在煤采矿保证设备的效率,面对,我们在脸结束调查了合适的保留方法和地板煤的恢复技术。上面的地板煤能被 shearer 直接与地板 dinting 恢复。在推进了地板 dinting 以后,更低的地板煤被 shearer 与地板 dinting 恢复并且为在一道拖拽网关保护煤方面保留步。地实践证明这个方法能改进恢复与大采矿高度在充分使机械化的工作的脸评估的煤。
出处 《Mining Science and Technology》 EI CAS 2011年第2期281-285,共5页 矿业科学技术(英文版)
基金 the Independent Research of the State Key Laboratory of Coal Resources and Mine Safety(No. SKLCRSM09X02) the Open Research Fund of the State Key Laboratory of Coal Resources and Mine Safety(No.08KF12) the Graduate Students of Jiangsu Province Innovation Program Funded Projects(No.CX09B_120Z) for their financial support
关键词 Great mining heights Floor coal at face ends Floor coal recovery Floor dinting Step for protecting coal side 开采高度 恢复技术 综采工作面 地板 煤层 煤炭回采率 顶部驱动 保存方法
  • 相关文献

参考文献2

共引文献6

同被引文献36

引证文献3

二级引证文献56

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部