期刊文献+

多阶段混合Flow Shop调度问题及其遗传求解算法 被引量:5

Genetic Algorithms for Multistage Hybrid Flow Shop Scheduling Problem
下载PDF
导出
摘要 针对多阶段混合Flow Shop 调度问题的一般结构和不同的调度目标函数,提出混合整数规划模型,并基于问题的结构特点设计了遗传求解算法。计算实验结果表明。 This paper considers the multistage hybrid flow shop scheduling problem. A mixed integer-programming model associated with different objective of minimizing makespan and total flow time is given. In view of complexity of the problem and limit of existent researches, an algorithm based on genetic approach is proposed to solve the problem. Some randomly generating problems and lower bounds on objective of makespan and total flow time are used to test and compare the performance of the algorithm. Computational results show that proposed algorithm is rather adaptive and efficient for the problems with different structure, size and objective function.
出处 《控制与决策》 EI CSCD 北大核心 1999年第A11期565-568,共4页 Control and Decision
基金 国家自然科学基金 863 理论研究项目
关键词 混合FlowShop 调度 遗传算法 目标函数 hybrid flow shop, scheduling, makespan, total flow time, genetic algorithms
  • 相关文献

同被引文献43

  • 1钟伟才,刘静,刘芳焦,李成.组合优化多智能体进化算法[J].计算机学报,2004,27(10):1341-1353. 被引量:34
  • 2曾齐红.基于遗传算法求解炼钢-连铸浇次排序问题[J].鞍山师范学院学报,2004,6(6):70-73. 被引量:2
  • 3李宏,焦永昌,张莉,王宇平.一种求解全局优化问题的新混合遗传算法[J].控制理论与应用,2007,24(3):343-348. 被引量:19
  • 4HE Y H, CHI W FI. Genetic algorithm for large-size multi-stage batch plant scheduling[J]. Chemical Engineering Science, 2007, 62(5): 1504- 1523.
  • 5ZHONG W C, LIU J, XUE M Z, et al. A multi-agent genetic algorithm for global numerical optimization[J]. 1EEE Transactions on Systems, Man, and Cybernetics-part B: Cybernetics(S1083-4419), 2004, 34(2): 1128 - 1141.
  • 6ZENG X P, LI Y M, JIAN Q. A dynamic chain-like agent genetic algorithm for global numerical optimization and feature selection[J]. Neurocomputing, 2009, 72(4/6): 1214- 1228.
  • 7CHI W H, AVANEESH G. A novel MILP formulation for short-term scheduling of multistage multi-product batch plants[J]. Computers & Chemical Engineering, 2000, 24(2): 1611 - 1617.
  • 8王万良,吴启迪.生产调度智能算法及应用[M].北京:科学出版社,2007.
  • 9PABLO A MARCHETTI, JAIME CERDA. A general resourceconstrained scheduling framework for multistage batch facilities with sequence-dependent changeovers[J]. Computers and Chemical Engineering, 2009, 33(4): 871 - 886.
  • 10Arthanari T S, Ramamurthy K G.An Extension of Two Machines Sequencing Problem.Opsearch, 1971, 8:10~22.

引证文献5

二级引证文献41

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部