标准施工招标文件与JCT调价方法的比较研究 被引量:1

Price Adjustment Rules Comparison between the Standard Construction Tender Documents and the JCT Contract
下载PDF
导出
摘要 介绍了我国标准施工招标文件的调价方法及特点,提出了该调价方法在我国房屋建筑工程实施过程中所遇到的一系列问题,并进行了分析。给出了英国JCT合同的调价方法及原则,从几个方面分析了标准施工招标文件与英国实行的JCT合同调价方式的差异,同时引入数据案例对JCT调价的基本方法和框架进行了演示,以详尽说明JCT调价的部分特点。通过对比分析提出划分基本工作并逐项调价,建立我国建筑行业物价体系及修正延误工期后重复惩罚制度等建议,从而提高我国工程合同的准确性和公平性。 This paper introduced the price adjustment methods and the characteristics of the standard construction tender documents in China. The issues existing in the implementation process were summarized. The JCT price adjustment method in the UK and its principles were introduced. The price adjustment differences were analyzed between the standard construction tender documents in China and the JCT. The data cases were used to show the basic JCT method and its characteristics. By comparison some suggestions were proposed to improve the accuracy and impartiality of the construction contracts in China, including the division for the basic work and the price adjustment one by one. Also the establishment of the construction price system and the duplicate penalty system for delaying the completion period.
作者 张树捷 李岚
机构地区 东北财经大学
出处 《工程管理学报》 2011年第3期271-275,共5页 Journal of Engineering Management
关键词 工程调价 物价体系 JCT调价 重复惩罚 construction price adjustment price system JCT price adjustment duplicate penalty
  • 相关文献

参考文献1

二级参考文献5

共引文献3

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部