摘要
通过对峻德矿新井主提绞车提升能力的分析,挖掘其潜力,提出了通过修改速度图、增大箕斗装载量等手段,并通过验算绞车主电机功率和液压站制动力矩是否满足等条件,给出了可增大提升能力的结论。阐述了绞车提升能力构成的关键因素和验算条件。提高了主提绞车的提升能力,满足了矿井向高产高效方向发展的需要。
Based on the jude put mine winch new wells to enhance capacity of the main analysis, and tap their potential, proposed by modifying the speed chart, and other means to increase the amount of skip loading, and by checking the main electrical power and hydraulic winch stand meets the brake torque conditions are given to increase the lifting capacity of the conclusions. Enhance the ability of the winch described the key factors and checking conditions. Provided to improve the main winch of the capability to meet the direction of the mine to the needs of high yield and efficiency.
出处
《煤炭技术》
CAS
北大核心
2011年第7期16-18,共3页
Coal Technology
关键词
绞车
提升能力
可行性分析
wiuch
lifting capacity
ability
feasibility
analysis