对西昌500 kV变—永郎开关站220 kV线路新建工程中氢气飞艇施放引绳施工进行了总结,分别阐述了飞艇施工特点,适用范围及工艺原理,详细介绍了飞艇施放引绳的施工工艺流程及操作要点,并指出了质量控制及安全措施,对今后同类工程具有指导意义。
The paper sums up the helium airship stringing cable technique in the newly constructed project of Xichang 500 kV-Yonglang switching station 220 kV lines,illustrates the airship's construction principle,the applied scope and craft principle,introduces the construction craft procedure for the helium airship stringing cable technique and its operation points,and points out the quality control and the safety measures,so as to have the direction significance for the similar projects in future.
出处
《山西建筑》
2011年第20期94-96,共3页
Shanxi Architecture
关键词
氢气飞艇
工艺原理
操作要点
安全措施
helium airship
craft principle
operation point