摘要
以某高层建筑地下室模板工程施工为例,介绍了墙体模板、柱模板及梁板模板的施工关键技术,阐述了模板拆除的基本要求,总结了模板工程施工中的常见问题及其解决措施,为类似工程提供指导性意见。
The paper uses an construction of formwork engineering in a basement of one high-rise building as an example.It introduced the main construction technology of wall form,pillar form and beam-slab form.It also expounded the basic requirements for form stripping,and sumed up the problems and its solve measures during the construction,so as to offered some advice for similar projects.