摘要
综采工作面的搬迁, 是煤矿生产的重要环节, 由于搬迁工作不利, 将会延长综采面的搬迁时间, 现介绍一种新的搬迁方法, 可大大缩短综采工作面的搬迁时间。
To relocate the fully- mechanized mining face is an important link in mining production. It would prolong the period for moving the fully-mechanized mining face out ,if the moving work is poor. There is a new method to be introduced which should greatly be short down the time limit for the relocation work.
出处
《山西煤炭》
1999年第4期46-47,共2页
Shanxi Coal
关键词
综采工作面
搬迁
拆除
安装
综采设备
改进
fully - mechanized mining face
relocate
dismantle
set up
time limit for a project