2[4]Yao-jong Lee,Luh-Maan Chang.Rehabilitation Decision Analysis and Life-Cycle Costing of the Infrastructure System[J].Construction Research,2003,(1):1-11.
4[6]Mark G Stewart,Dimitr V Val.Multiple Limit States and Expected Failure Costs for Deteriorating Reinforced Concrete Bridges[J].Journal of Bridge Engineering,ASCE,2003,(11):405-415.
5[7]Jung S Kong,Dan M Frangopol.Life-Cycle ReliabilityBased Maintenance Cost Optimization of Deteriorating Structures with Emphasis on Bridges[J].Journal of Structural Engineering,ASCE,2003,(6):818-828.
6[8]S Meiarashi.Life-Cycle Cost of All-Composite Suspension Bridge[J].Journal of Composites for Construction,2002,(12):206-214.
8Use of Non-corrodible Reinforcement in Concrete Bridges.
9Brad Violetta. Life-365 Service Life Predication Model. Concrete International, 2002, (11).
10Rostam Steen.Performance-Based Design of Structures for the Future. Proceedings of the IABSE Symposium Structures for the Future-the Search for Quality. Rio de Janeiro, Brazil. 1999.