摘要
本文叙述了我国第一条34Mb/s长途光缆二级干线工程光缆线路的施工情况。除了对光缆的架设、接续、测试等实践作简要介绍外,还对其中的几个技术问题进行了一些分析、讨论。
In this paper, the first provincial 34 Mb/s long-distance fiber cable trunk line in China is described. Besides the cable installation, splicing and testing, some technical problems in these processes are also analysed and discussed.
出处
《光通信研究》
1989年第1期23-31,共9页
Study on Optical Communications