汛期隔河岩大坝工作性态分析

Analysis of Behavior of Geheyan Dam in Flod Period
下载PDF
导出
摘要 1998 年汛期,为了与长江洪水错峰,减少荆江大堤防洪压力,清江隔河岩水库蓄水高达203-94m ,超过了千年一遇的洪水标准- 为了掌握高水位下大坝工作性态,本文根据安全监测资料对大坝关键部位的工况进行了初步分析,得出了一些有益的结论,为今后防汛提供了决策依据- In the flood period of 1998, in order to adjust the flood crest of the Yangtze River and Lessen the pressure of flood prevention of Jingjiang large levee, the level of Qingjiang Geheyan reservoir had been reached 203 94m, and was higher than the standard of 1000 years of flood occurrence In order to understand the dam behavior in high level, the paper analyzes the behavior of key parts of the dam on the basis of the safety monitoring data, and draws some beneficial conclusions, and provides some decision basis to flood prevention in future
出处 《武汉水利电力大学(宜昌)学报》 1999年第4期287-291,共5页
关键词 大坝 安全监测 位移 应力应变 渗流渗压 dam safety monitoring displacement stress and strain seepage folw and seepage force
  • 相关文献

参考文献2

  • 1何薪基 蔡德所 等.清江隔河岩水利枢纽安全监测资料分析报告(1998年度)[M].宜昌:武汉水利电力大学,1999..
  • 2何薪基,清江隔河岩水利枢纽安全监测资料分析报告(1998年度),1999年

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部