摘要
本文介绍了汾河二库流水施工的组织方式。
The advantages and disadvantages of three construction methods,namely successive one,parallel one and assembly line one are introduced,the feasibility of roller compaction with the assembly line construction method is determined,and the economic effect of application of the assembly line construction method in Fenhe Reservoir Ⅱ is also analysed.
出处
《山西水利科技》
1999年第4期30-33,共4页
Shanxi Hydrotechnics
关键词
流水施工
碾压混凝土
重力坝
施工组织方式
Assembly Line Construction Method Application Roller Compaction Fenhe Reservoir Ⅱ